Live conditions

Mountain conditions

Weather at four elevations, the 7-day snow outlook, Highway 99 and the avalanche forecast — all in one place.

Right now

Updated 7:15pm
675 m

Whistler Village

🌙5°
Clear · feels 3°
Wind 6 NE
Gusts 6 km/h
Snow 24h 0 cm
Next 48h 0 cm
1,850 m

Roundhouse

🌙-1°
Clear · feels -4°
Wind 3 N
Gusts 3 km/h
Snow 24h 0 cm
Next 48h 2 cm
2,182 m

Whistler Peak

🌙-3°
Clear · feels -6°
Wind 3 N
Gusts 3 km/h
Snow 24h 0 cm
Next 48h 2 cm
2,284 m

7th Heaven, Blackcomb

🌙-3°
Clear · feels -6°
Wind 2 NW
Gusts 3 km/h
Snow 24h 0 cm
Next 48h 6 cm

🧊 Freezing level: about 2,200 m. Rain possible high up; snow only near the peaks.

7-day forecast

DayHigh / LowSnowPrecipChanceMax wind
Today 🌦️ 10° / 4° — — 18% 8 km/h
Wed Nov 4 🌦️ 10° / 4° — 2 mm 89% 13 km/h
Thu Nov 5 🌦️ 6° / 3° — 2 mm 84% 17 km/h
Fri Nov 6 🌧️ 6° / 4° — 22 mm 98% 10 km/h
Sat Nov 7 🌧️ 8° / 4° — 33 mm 84% 15 km/h
Sun Nov 8 🌧️ 4° / 3° — 28 mm 95% 18 km/h
Mon Nov 9 🌦️ 5° / -2° — — 69% 9 km/h

Forecasts are elevation-adjusted model data from Open-Meteo, not measured snowfall. For official snow totals see the Whistler Blackcomb snow report.

Sea-to-Sky Highway 99

Minor roadwork
  • Construction · Road Maintenance Minor
    Utility work from Highway 99, In-Shuck-CH Forest Service Road to In Pemberton and At Harrow Road. Starting Tue Oct 13 until Mon Nov 30. From 8:00 AM to 4:00 PM PDT, every day. Single lane alternating traffic. Tree trimming for BC Hydro.
  • Construction · Road Maintenance Minor
    Tree pruning from Highway 99, In Whistler, At Lorimer Road and Soo Valley Road. Starting Fri Oct 9 until Mon Nov 30. Single lane alternating traffic. Shoulder closed. Tree trimming for BC Hydro power lines.
  • Construction · Planned Event Minor
    Utility work from Highway 99, In Pemberton and Park St to In Pemberton and Underhill Ln. Starting 10:00 AM PCT on Monday November 9, 2026 until 12:00 PM PCT on Tuesday November 10, 2026. From 10:00 AM to 12:00 PM PCT, Monday and Tuesday.
  • Construction · Planned Event Minor
    Construction work at Highway 99, Suicide Hill. Starting 7:00 AM PCT on Tuesday November 3, 2026 until 5:30 PM PCT on Friday November 6, 2026. From 7:00 AM to 5:30 PM PCT, Tuesday to Friday. Expect 20 minutes delay. Single lane alternating traffic.
  • Construction · Planned Event Minor
    Paving operations from Highway 99, Lions Bary to Porteau Cove. Starting 9:00 AM PCT on Wednesday November 4, 2026 until 4:00 PM PCT on Wednesday November 4, 2026. Single lane alternating traffic. Expect delays.
  • Construction · Road Maintenance Minor
    Road maintenance from Highway 99, At Nordic Drive and 500m West of Nordic Drive to In Whistler. Starting Tue Oct 13 until Thu Dec 31. From 6:00 AM to 7:00 PM PDT, every day. Single lane alternating traffic. Fuel management and reduction for community wildfire risk reduction.
  • Construction · Planned Event Minor
    Utility work from Highway 99, In Whistler and At Alpha Lake Road to In Whistler. Starting 7:00 AM PDT on Thursday October 29, 2026 until 6:50 PM PCT on Saturday November 7, 2026. From 7:00 AM to 5:00 PM PDT, every day. Right lane closed in both directions. Watch for traffic control. Traffic control in place 24/7. Use caution when passing.

Winter tires (M+S or mountain snowflake) are required on Highway 99 from October 1 to March 31. DriveBC map & cameras →

Avalanche forecast

Friday · Backcountry danger ratings

Alpine
Early Season
Treeline
Early Season
Below treeline
Early Season

Avalanches hazard may exist where there is snow. Pack a transceiver, shovel, and probe, and factor avalanches into your trip plan. Daily avalanche forecasts will begin November 25 at 4 PM.

Full forecast at Avalanche Canada

Ratings apply to the backcountry, not to patrolled ski runs. Carry a transceiver, shovel and probe and get training before leaving the ski area boundary.